The proposed site of Guoxin semiconductor (Yizheng) Co., Ltd. is located at No. 1 Mintai Avenue, Yizheng Economic Development Zone. According to the requirements of environmental management, Jiangsu Shengtai Environmental Technology Co., Ltd. is entrusted to undertake the environmental impact assessment of our company. In accordance with the provisions of the Interim Measures for public participation in environmental impact assessment (HF 2006 [28]) issued by the State Environmental Protection Administration, the relevant information is hereby published as follows:
1、 Name and overview of construction project
1. Project Name: 1.2 million pieces of analog and digital analog integrated circuits with an annual output of 0.18 micron and below
2. Project Overview:
At present, with the progress of China's semiconductor technology and the strengthening of world trade, the industrial structure of the global semiconductor industry has undergone great changes, and the characteristics of international division of labor are becoming more and more obvious. The chip production of IC and memory is mainly abroad, which is produced by 8 "- 12" silicon chip production line; The chips of discrete devices are increasingly being transferred to Chinese mainland, and the production line is made from 3 "-6" silicon wafer production line, and the demand for products is not enough, and the market is very promising. The project maintains the international advanced level in the unique manufacturing field of large split device chips. On the basis of successful investment in China, Japan International Electronic Trading Co., Ltd. continues to increase investment projects in China and establishes Guoxin semiconductor (Yizheng) Co., Ltd. to build a new analog and digital analog integrated circuit project with an annual output of 1.2 million chips of 0.18 micron and below. The total investment of the project is 99.8 million US dollars (610.02 million yuan), which is planned to be built at No. 1 Mintai Avenue, Yizheng Economic Development Zone. The project will build production plants, R & D buildings, integrated circuit production lines, etc. After completion, it will reach the production scale of 1.2 million analog and digital analog integrated circuits with an annual output of 0.18 micron and below.
2、 Name and contact information of the employer
Company name: Guoxin semiconductor (Yizheng) Co., Ltd
Tel.: 13951434528 contact: LV Shuanglin
Address: No. 89, Hongda Road, Yangzhou Economic Development Zone
3、 Unit undertaking environmental impact assessment and contact information
Company name: Jiangsu Shengtai Environmental Technology Co., Ltd
Tel: 025-66082282 Fax: 025-84587267
Contact: Chen Gong
Address: Qianshan Science Park, 151 Jiangjun Avenue, Nanjing
4、 Working procedures and main work contents of environmental impact assessment
1. Assessment procedure: the main working procedure of environmental impact assessment is to accept the entrustment of the assessment, carry out project overview investigation, conduct on-site investigation and monitoring of the environmental quality around the project, and prepare the environmental assessment report.
2. Main work contents: conduct detailed analysis on the analog and digital analog integrated circuit project with an annual output of 1.2 million pieces of 0.18 micron and below, quantitatively calculate and qualitatively analyze the intensity of various pollution sources generated during the operation of the project, and put forward practical pollution prevention and control measures to ensure that all kinds of pollutants of the project meet the discharge standard and minimize their impact on the surrounding environment; Analyze whether the project site selection is feasible; Carry out public participation activities; Propose environmental management and monitoring plan.
5、 Main matters for soliciting public opinions
Scope: affected residents and units around the project site.
Main matters: ① main public attitudes towards the proposed project; ② Consider the existing main environmental problems; ③ Main environmental impacts during the construction period of the project; ④ How to mitigate the environmental impacts such as noise, wastewater, waste gas and solid waste produced by the project construction; ⑤ Other suggestions and requirements.
6、 Main ways of public opinion
Tel: 025-66082282
Fax: 025-84587267
Send email to 624360941@qq.com
7、 Publicity time
The time for soliciting opinions is within 10 working days from the publication of this publicity.